Main St. Bridge Construction
Main St. bridge construction in Trotwood causes reroute for Route 12 and the North Community Connector.
Main St. bridge construction in Trotwood causes reroute for Route 12 and the North Community Connector.
RTA to adjust service beginning Nov. 10, 2024. Visit www.iriderta.org for details.
RTA to adjust service beginning Nov. 10, 2024. Visit www.iriderta.org for details.
RTA to adjust service beginning Nov. 10, 2024. Visit www.iriderta.org for details.
Main St. bridge construction in Trotwood causes reroute for Route 12 and the North Community Connector.
RTA to adjust service beginning Nov. 10, 2024. Visit www.iriderta.org for details.
RTA to adjust service beginning Nov. 10, 2024. Visit www.iriderta.org for details.
Due to construction near Miller Lane and Maxton, Routes 17 and 22 will be re-routed in this area.
RTA to adjust service beginning Nov. 10, 2024. Visit www.iriderta.org for details.
RTA to adjust service beginning Nov. 10, 2024. Visit www.iriderta.org for details.
Starting on Monday, Sept. 23, the bridge on Main St. in Trotwood will be closed for 45 days. The North Connector (NC) and Route 12 will be rerouted. The North Connector eastbound and westbound will have access to the Trotwood loop through Main St. and Broadway, but the 12 northbound will not be able to access this part of Trotwood and will have to turn around from the layover.
The following stops are impacted:
#6702 Main at Stuckhardt (closed)
#1439 Main at 307 Main (closed)
#1440 Main at Sunrise (use NC)
#1441 Main at Broadway (use NC)
#7857 Perry at Main (closed)
#7859 Grand at Broadway (closed)
#6892 Main at Broadway (use NC)
#1470 Main at Sunrise (use NC)
#1471 Main at Coffman (use NC)
#6703 Main at Beardsley (use 12)
#6704 Main at Macgregor (use 12)
#1429 Free Pike at Olive Rd. (use 12)
#6707 Main at Beardsley (use 12)
#6708 Main at Stuckhardt (use 12)